Two Quality Ducuments That a Quality Engineer Can Issue to Construction Team

Sharing is Caring:

In the ongoing construction of any civil engineering projects, you will definitely use the two quality documents. There will be problems we encounter at the site and we cannot avoid them. For example mistakes of the width of the footing not as per approved drawing, the material used for the footing like steel or spacer, size of the door openings not as per drawing, etc. But these problems sometimes happen on-site and we can’t control them due to various kinds of reasons. And then the two quality documents will come into the picture.

If the quality engineer noticed the problems or issues on site he may write or issue either of the two documents depending on the status of the problem. Here are the two quality documents that a quality engineer can issue to a construction team.

Here are the two quality documents that you need.

1. Site Observation, SO

2. Non-conformance Report, NCR

Non-conformance report meaning is “A failure to comply with a requirement of a company’s quality system.”

With the meaning itself, you can easily identify the non-conformance on and after, and during the activities at the site.

Here are two types of non-conformance that you can notice:

a. Non-conformance during the work

b. Non-conformance after work

There are many instances of Site Observation and Non-conformance that can be shown here but I just made the above in order to give everybody an insight on how to figure out and show the difference between the two.

Did you use the above quality documents? If you do, please write down your experience and suggestions in the comment box below.

If you have supplements to the above please comment your thoughts below.