Site icon Quality Assurance and Quality Control in Construction

My Books

Sharing is Caring:

Method Statement for Construction

These are the method statements we’ve used in our projects and accepted by Engineers whom we worked with. These method statements are also used by Project Manager, Construction Manager, Project Engineer, Site Engineer, Quality Engineer, Quantity Surveyors and many more. Be familiar now with learning and reading these method statements and eventually use these on your project.

Here is the step-by-step guide on how to buy my ebooks.
“How to buy my ebooks.”

Method Statement for Substructure

The contents of this ebook are the following:

1. Method Statement for Excavation & Backfilling Works
2. Method Statement for Blinding Works
3. Method Statement for Anti-termite Works
4. Method Statement for Application of Bituminous Waterproofing Works
5. Method Statement for Application of Waterproofing Membrane
6. Method Statement for Sand Protection During Casting of Blinding
7. Method Statement for Footing Concrete Pouring
8. Method Statement for Kerbstone & Interlock Works
9. Method Statement for Road Works
10. Method Statement for Dewatering Works
11. Method Statement for Deep Excavation
12. Method Statement for Plate Load Test

 

Superstructure Part -1

The contents of this ebook are the following:

1. Method Statement for Block Works
2. Method Statement for Plaster Works
3. Method Statement for Painting Works
4. Method Statement for Carpet Tiles Installation
5. Method Statement for Installation of Ceramic Wall Tile
6. Method Statement for Ceramic Floor Tile
7. Method Statement for Gypsum Board Partition
8. Method Statement for Aluminum Windows & Curtain Walls
9. Method Statement for Installation of Wooden Door
10. Method Statement for Installation of Steel Door
11. Method Statement for Concrete Floor Finishing
12. Method Statement for Vinyl Floor Covering
13. Method Statement for Application of Epoxy Paint on Concrete Floor

Superstructure Part – 2

The contents of this ebook are the following:

1. Method Statement for Installation of Gypsum Board Ceiling
2. Method Statement for Installation of Handrail
3. Method Statement for Dock Leveler
4. Method Statement for Installation of False Ceiling
5. Method Statement for Concreting Ramp and Platform
6. Method Statement for Installation of 3M Film on Airport Tower Glass
7. Method Statement for Installation of Architectural Glass on Control Tower
8. Method Statement for Installation of Chain-Link Fence
9. Method Statement for Installation of Shelves
10. Method Statement for Installation of GRP Lining
11. Method Statement for Wet Area Waterproofing
12. Method Statement for Installation of Bollards
13. Method Statement for Installation of Crash Barrier

Steel Structure

The contents of this ebook are the following:

1. Method Statement for Steel Erection Works
2. Method Statement for Installation of Panel Decking
3. Method Statement for Grouting
4. Method Statement for Installation of Insulated Roof and Wall Cladding Works

Method Statement for Construction for Civil & Quality Engineer

Here is the Table of Contents of this book.

Introduction
Chapter 1: Method Statement for Raft Slab Concrete Pouring
Chapter 2: Method Statement for Shoring Wall Block Work
Chapter 3: Method Statement for Casting Concrete on Vertical Elements
Chapter 4: Method Statement for Installation of AAC Block Work
Chapter 5: Method Statement for Erection of Hollow Core Slab
Chapter 6: Method Statement for Normal Cement Site-Mix Plaster Works
Chapter 7: Method Statement for Cast In-Situ Wheel Stopper
Chapter 8: Method Statement for Kerbstone and Interlock Tiles
Chapter 9: Method Statement for Closing of Tower Crane Opening
Chapter 10: Method Statement for Shut Off of Dewatering System
Chapter 11: Method Statement for Water Leakage Test for Curtain Walls
Conclusion

Inspection and Test Plan

Here are the “Inspection and Test Plans” we have used from all the projects that I involved with. It is tested and proven and used by almost all big companies and consultants that I worked with. These were used by quality engineers, inspectors, consultants, quality managers, project managers etc.

Inspection and Test Plan Part -1 & 2

The contents of this ebook are the following:

Part – 1

1. Inspection and Test Plan for Excavation and Backfilling
2. Inspection and Test Plan for Installation of Rebar and Concrete Work
3. Inspection and Test Plan for Water Proofing Membrane
4. Inspection and Test Plan for Blockworks

Part – 2

1. Inspection and Test Plan Plaster – Premix
2. Inspection and Test Plan for External Works for External & Internal Wall Under Ceiling

Inspection Test Plan Part – 3

The contents of this ebook are the following:

1. Inspection and Test Plan for Application of Epoxy Paint on Concrete Flooring
2. Inspection and Test Plan for Installation of Wall and Floor Tiles
3. Inspection and Test Plan for Installation of Acoustic Ceiling
4. Inspection and Test Plan for Installation of Bollards
5. Installation and Test Plan for Installation of Gypsum Board and Suspension Ceiling

Checklist

Here are the “Checklists” that all Engineers used since the start and during the progress of the project. This way you could easily find out what is not installed or in placed.

Checklist for Substructure Part -1

  The contents of this ebook are the following:

1. Checklist for Excavation Works
2. Checklist for Backfilling and Compaction Works
3. Checklist for Blinding Works
4. Checklist for Rubberized Waterproofing
5. Checklist for Waterproofing Works (Membrane)
6. Checklist for RCC Footing
7. Checklist for Slab On Grade
8. Checklist for Casting Concrete for Duct Bank

Risk Assessment and Job Safety & Environmental Analysis

Here are the Risk Assessment and Job Safety & Environmental Analysis that we have used in our project. In order to prevent the accidents on the construction site and to maintain the record of having no loss time injury at even in infinite million hours so therefore, we should provide this document.

Risk Assessment and Job Safety & Environmental Analysis Part -1

  The contents of this ebook are the following:

 

1. Installation of Crash Barrier
2. Installation of Fire-rated Steel Door
3. Cast In-situ Concrete
4. Plaster Works
5. Installation of Wall and Floor Porcelain Tiles

Sharing is Caring:
Exit mobile version